...

Water Tank Installation

Nationwide Coverage Across the UK

slip safety logo

Industrial & Commercial Water Tank Installation

WRAS-compliant cold water storage, sprinkler and process tanks, supplied, installed and commissioned for commercial and industrial sites nationwide.

WATER TANK INSTALLATION

Industrial & Commercial Water Tank Installation

Nationwide Coverage Across the UK

slip safety logo

WRAS-compliant cold water storage, sprinkler and process tanks, supplied, installed and commissioned for commercial and industrial sites nationwide.

Our Clients

Trusted By Industry Leaders

Engineered for Your Site

WRAS-Approved Water Storage Systems

Stored water is only as safe as the tank holding it. Ageing, poorly sealed or undersized tanks lead to stagnation, sediment build-up and temperature gain, all of which create a real risk of bacterial growth and leave sites falling short of their duty under the Water Supply (Water Fittings) Regulations and ACoP L8.

We design, supply and install sectional and one-piece GRP cold water storage tanks, sprinkler tanks and process vessels, all built from WRAS-approved materials. Every installation covers base and support steelwork, insulated and screened tanks with lockable access, correctly sized pipework and overflows, and full chlorination and commissioning before handover, so your system is signed off and ready for service.

What Are You Looking For?

Explore our complete range of specialist facility and flooring services.

i

Free Site Surveys

Zero-obligation tank surveys.

}

Minimal Downtime

Planned around your shutdown.

10+ Years Experience

Proven industry track record.

Nationwide Coverage

Serving sites across UK.

Why Upgrade Your Water Storage Tank

Old steel and concrete tanks corrode, leak and allow light and debris in, giving bacteria ideal conditions to multiply. A modern insulated GRP tank protects water quality and brings the installation back into compliance.

Efficient Project Management

Protect Water Quality

Sealed, screened and insulated tanks keep out light, insects and debris, and hold stored water at a safe temperature to limit bacterial growth.

Fully Accredited & Compliant

ACoP L8 & WRAS Compliance

Installed to meet the Water Supply (Water Fittings) Regulations, ACoP L8 and HSG274 guidance, using WRAS-approved materials throughout.

Minimal Water Downtime

Tanks Sized to Demand

Sectional tanks are configured to your capacity, turnover and plant room access, from compact loft tanks to large sprinkler stores.

Written Performance Warranty

Built for Long Service Life

GRP panels will not corrode like steel or spall like concrete, giving decades of service with straightforward inspection and cleaning.

What Our Tank Installations Include

A complete installation package covering survey, design, supply, fit-out and commissioning. Every tank is sized to your actual demand and turnover, then chlorinated, tested and certified before it is handed back into service.

Sectional GRP Tanks

WRAS-Approved Materials

Cold Water Storage Tanks

Bespoke Tank Sizing

Sprinkler & Fire Tanks

Insulated & Screened

Old Tank Strip-Out

Base & Steelwork Supports

Pipework & Valve Sets

Chlorination & Sampling

Commissioning & Certification

Available Manufacturers Guarantee

Our Featured Work

Recent Tank Installations

A selection of recent cold water storage, sprinkler and process tank installations across commercial and industrial sites.

Why Choose FLR Resins

From initial survey through to chlorination and handover, we keep your water system compliant and your site operating.

Efficient Project Management

Trusted by major operators including Amazon and Ferrari to deliver large-scale installations smoothly, on time, and on budget.

Fully Compliant & Certified

Our entire on-site team holds valid CSCS cards, operating under strict, site-specific RAMS and comprehensive public liability insurance.

Minimal Water Downtime

Tank changeovers are planned around your operation, with temporary supplies or phased sectional builds where water cannot be taken offline.

Industrial-Grade Durability

Specified for demanding environments, with robust GRP panels, galvanised steelwork and fittings built to last in plant rooms and external compounds.

Manufacturers Guarantee

We handle strip-out, installation and commissioning in-house, supplying available manufacturers’ guarantees.

Our Partners

Certified System Installers

Our Proven Process

Our Installation Process

Step-01

Site Survey & Tank Design

We survey the plant room or compound, assess access, capacity and turnover, then specify a tank configuration that fits the space and meets demand.

Step-02

Base Preparation & Strip-Out

The old tank is drained, broken down and removed, and a level base with correctly spaced steelwork supports is prepared to carry the new tank.

Step-03

Tank Build & Pipework

Sectional panels are built in situ, then insulated, screened and connected to correctly sized inlet, outlet, overflow and warning pipework.

Step-04

Chlorination & Commissioning

The tank is filled, chlorinated and flushed to BS 8558, then sampled and tested before certification and handover documentation are issued.

Common Questions

Explore Our Frequently Asked Questions

Are your tanks WRAS-approved?

Yes. All tanks are manufactured from WRAS-approved materials suitable for potable water, and installations are carried out to meet the Water Supply (Water Fittings) Regulations, ACoP L8 and HSG274 guidance.

Can you install a tank without shutting off our water?

In most cases, yes. Twin-compartment tanks allow one side to stay in service while the other is worked on, and temporary storage or phased changeovers can be arranged where a full shutdown is not practical.

What size tank will we need?

Capacity is based on your daily demand, occupancy and the turnover needed to prevent stagnation, balanced against plant room access. Oversized tanks are a common cause of poor water quality, so we size to actual usage rather than simply replacing like for like.

Why choose GRP over steel or concrete?

GRP will not corrode like steel or spall like concrete, and sectional panels can be carried through standard doorways and built in situ, which makes replacement far easier in plant rooms with restricted access.

How long does an installation take?

A straightforward tank replacement typically takes two to five days including strip-out, build and commissioning. Larger sprinkler or process installations run longer, and we confirm a programme at survey stage.

Request a Free Survey, Consultation or Quote

Get in touch today to discuss your project. Our specialists provide fast on-site inspections, tailored advice, and upfront pricing.

Call Now Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.